New here? Use code HELLO10 for 10% off your first order
We prepare orders in 1–3 working days, and most UK addresses receive them 3–7 working days after dispatch. A tracking link arrives by email once your parcel is on its way.
Changed your mind? You have 30 days from delivery to send an item back, and we never ask why. We email a prepaid label, and your refund reaches your original payment method within 10 working days of the item arriving with us.
Not sure about sizing, materials or compatibility? Email support@ardentpets.co.uk with the product name and we will reply within 1 working day (Monday to Friday).
WATFOON’s 200 ft (61 m) dog tie-out cable is an outdoor tether for giving dogs room to move, with a 5 mm (0.2 in) stainless-steel wire core and PVC coating.
When an outdoor outing calls for more range than a short lead, this cable creates a long tie-out line for a dog to move around while staying attached to an anchor. Its length suits settings such as a yard, garden, park, beach or campsite, and it can also be used while practicing recall. The purple cable is designed to be easy to carry and store.
The WATFOON tie-out cable provides an extended outdoor tether for dogs and is also intended for recall training. Its stainless-steel wire has a PVC coating, and the cable’s chew-proof design pairs those materials for outdoor use. The wire is 5 mm (0.2 in) in diameter, while the cable’s stated break strength is 1,000 lb (453.6 kg).
WATFOON equips both ends with 304 stainless-steel clips that swivel through 360°, so the tether can be attached to a spiral stake or ground post. Metal reinforcement rings at the ends help reduce excessive wear and the risk of breakage where the cable is joined.
The 200 ft (61 m) lead is intended for outdoor locations including yards, gardens, parks, beaches and campsites. It gives a dog room to move around the tether point and can be used for recall practice; it also leaves the handler’s hands free for other tasks.
This WATFOON cable suits dog owners who want a long outdoor tether for movement or recall practice, with swivel connections for a spiral stake or ground post. It is rated for dogs weighing up to 300 lb (136 kg), making the weight rating an important fit point when choosing it for your dog.
Q: What size dogs is the WATFOON dog tie-out cable rated for?
A: The WATFOON dog tie-out cable is rated for dogs weighing up to 300 lb (136 kg) and has a stated break strength of 1,000 lb (453.6 kg).
Q: What can the WATFOON dog tie-out cable attach to?
A: The WATFOON dog tie-out cable has 360-degree swivel clips on both ends for attachment to a spiral stake or ground post.
Read our guide: Your puppy’s first weeks at home: routine, vet visits and socialising
Free UK delivery on every order, with no minimum spend. We prepare orders in 1–3 working days, and most UK addresses receive them 3–7 working days after dispatch. A tracking link arrives by email once your parcel is on its way. Full details are on our delivery and returns page.
Free returns within 30 days. Changed your mind? You have 30 days from delivery to send an item back, and we never ask why. We email a prepaid label, and your refund reaches your original payment method within 10 working days of the item arriving with us. See the returns policy.
Arrived damaged or not what you ordered? Email a photo to support@ardentpets.co.uk and we will put it right.
Thanks for subscribing!
This email has been registered!